NOTIFICATION
Addendum
The following communication, dated 24 August 2023, is being circulated at the request
of the delegation of the United States of America.
_______________
Title: Oil and Gas and Sulfur Operations in the Outer Continental
Shelf--Blowout Preventer Systems and Well Control Revisions
Description: The
Department of the Interior (DOI or Department), through the Bureau of Safety
and Environmental Enforcement (BSEE), is revising certain regulatory provisions
published in the 2019 final well control rule for drilling, workover, completion, and decommissioning
operations (notified as G/TBT/N/USA/1367/Add.2). BSEE is finalizing these revisions to clarify blowout
preventer (BOP) system requirements and to modify certain specific BOP
equipment capability requirements. This final rule will provide consistency and
clarity to industry regarding the BOP equipment and associated operational
requirements necessary for BSEE review and approval and will further ensure
operations are conducted safely and in an environmentally responsible manner.
DATES:
This final rule is effective on 23 October 2023. However, BSEE will defer the
compliance date for the Remotely Operated Vehicle (ROV) intervention open
functionality provision at 30 CFR 250.734(a)(4) until 22 August 2024. The Director of the Federal Register
approved the incorporation by reference of certain publications listed in this
final rule as of 15 July 2019.
BSEE's
regulations are codified in 30 Code of Federal Regulations (CFR) Part 250: https://www.ecfr.gov/current/title-30/chapter-II/subchapter-B/part-250?toc=1.
This
final rule and the proposed rule notified as G/TBT/N/USA/1367/Rev.1 are identified by Docket Number BSEE-2022-0009. The Docket
Folder is available on Regulations.gov at https://www.regulations.gov/docket/BSEE-2022-0009/document and provides access to primary and supporting documents as
well as comments received. Documents are also accessible from Regulations.gov by searching the Docket Number.
__________
[1] This information can be provided by including a website address, a
pdf attachment, or other information on where the text of the final/modified
measure and/or interpretive guidance can be obtained.