EMC/EMI PILOT PROJECT
dRAFT LIST OF TYPES OF CONFORMITY ASSESSMENT PROCEDURES
FOR
EMC/EMI USED BY ITA PARTICIPANTS
Note by the Secretariat[1]
Revision
1.1. At the Committee's formal meeting
of 24 February 2005, the Secretariat was asked to draw up a list to
categorize the type of assessment procedures adopted and used by each ITA participant.
The list below has been drafted based on the information available as contained
in G/IT/SPEC/Q4 series and compiled in G/IT/SPEC/Q4/19/Rev.2. Types of the
conformity assessment procedures used by ITA participants are summarized
below as (a) to (f) in descending order of complexity as per the Guidelines for
EMC/EMI Conformity Assessment Procedures (G/IT/25), however, another
category is added as (g) to specify those participants applying no mandatory
assessment procedure:
[1] This document has been prepared under the Secretariat's own
responsibility and is without prejudice to the positions of Members or to their
rights and obligations under the WTO.